Electrical, Instrumentation & Control
Engineer with over 10 years of diverse experience in EI&C design, drafting,
panel FAT/SAT, substation secondary systems, and project coordination across
power, water, mining, and industrial projects in the Philippines, Japan,
Vietnam, Australia, and the USA. Skilled in preparing and reviewing complete
drawing packages, conducting pre-commissioning, and ensuring compliance with
international standards.
Key project contributions include:
Waste-to-Energy & Treatment Plants –
Led EI&C design, control panel FAT/SAT, and pre-commissioning activities
for major incineration and water treatment plant projects (Funabashi, Sasebo,
Izumo, Iwakuni, Tottori, and La Mesa).
Substation & Energy Projects –
Delivered secondary drafting and backdrafting packages for Western Power
(Australia) projects, capacitor banks, feeder circuits, and battery energy
storage systems (KBESS, CBESS, Shotts Terminal, Cook St., Whiteman Park,
Metronet Bellevue).
Mining & Industrial Facilities –
Spearheaded the I&C drawing package for the Enlink JISH Leach Plant Project
(USA), coordinating closely with US counterparts to meet schedule and quality
requirements.
Utilities & Distribution – Former
Meralco Project Engineer, managing pole relocation, cable upgrading, substation
tie-ins, and local distribution projects, ensuring reliable power delivery.
Proficient in AutoCAD, AutoCAD Electrical,
AVEVA E3D, Revit, Microstation, EPLAN Electric P8, and MS Office, with proven
ability to adapt across multidisciplinary teams and international projects